Thursday, 1 February 2018
Wednesday, 13 December 2017
The Ikom/Alok monoliths in tentative list for World Heritage Status
These monoliths are the logo of the Cross River Tourism Bureau and are depicted in a giant sculpture at a roundabout on the highway. A very important tourism asset)
Here is an excerpt from UNESCO
Statements of authenticity and/or integrity
The stone monoliths of Alok Ikom bear a form of writing and a complex system of codified information. Although they seem to share the same general features, each stone, like the human finger print, is unique from every other stone in its design and execution.
The geometric images on the monoliths suggest that their makers possessed more than a basic knowledge of mathematics, not only because they are geometric, but also because of the obvious implication that there were computations and numbers on the layout of the stones.
Comparison with other similar properties
The Ikom monoliths with their geometric inscriptions could be compared to the rock Arts of Tanzania. The meanings of the codified symbol are known to only the artists. These are also associated with their origin, which is like most rock art works in Africa. Ikom monoliths could be West Africa's answer to United Kingdom's Stonehenge.
for more information >>> http://whc.unesco.org/en/tentativelists/5173/
Tuesday, 7 November 2017
Super Highway: Communities Spit Fire Over Non Payment Of Compensation
Source New Nigerian Newspaper by VITALIS UGOH, Calabar
Villagers from Ikot Okpo Ene, Ikot Ndarake and Ikot Abasi Effiom in Akpabuyo local government area of Cross River, have vowed not to allow construction work on the proposed Superhighway until the state government pays compensation on the destruction of property and economic crops.
Over a billion Naira worth of property, farm lands and economic crops were lost as the government cleared the starting point of the project.
The people have remained in perpetual hardship and pains in the last two years when the state government conceived the idea of constructing the superhighway which till now has not seen the light of the day.
It would be recalled that President Muhammadu Buhari had on 30th October, 2015 performed the ground breaking ceremony to commence the construction of a superhighway from Bakassi to Obanliku in the state.
However soon after the ceremony, the state government mobilised machines to the affected three communities in Akpabuyo and began clearing of farm lands as well as economic trees which are the major sources of income for the villagers.
Narrating their ordeal to newsmen, Chief Emmanuel Okon, who spoke on behalf the three communities, regretted ” that no inventory was taken by government on the number of economic trees and property destroyed. Till the his moment, no plan has been made by the state government to pay compensation to the affected comminatory and individuals”.
Okon said ” the sources of livelihood of our people especially women have been destroyed as women and children have resorted to begging to survive”.
This ugly development, he said, has increased the rate of youth restiveness and crime in the area while over 10 youths and children have dropped from school due to the inability of their parents to pay their fees.
He commended the out cries of the Non-governmental organisations in the state which made the Federal government to halt the project until the Environmental Impact Assessment (EIA) is carried out.
As a community, he added, “we are not aware of any of the conditions that have been met as directed by the Federal Ministry of Environment by the state government especially the directive to consult with the host communities and issue of payment of compensation”.
Despite not meeting the conditionalities, he said, “the state government has mobilised machines on site to resume the clearing of the farm lands, when there is no formal approval of the (EIA) from the Federal government”.
While describing the project as “one shrouded with deceit and illegality as well as anti people” he called on the Federal government to compel the state to as a matter of priority pay compensation to the affected communities.
Also speaking, chief Saviour Effiom Duke from one of the communities, expressed worry over the plight of his people whose property and farm lands as well as economic trees were destroyed.
He called on the Federal government to compel the state government to commence the payment of compensation without delay.
“We are not against the construction of the superhighway, but government should pay compensation over the destruction of our property and economic trees.
Also, a blind man and several widows narrated their ordeal as they had lost their palm plantations and their farmlands.
Source New Nigerian Newspaper
Friday, 15 September 2017
DOWNLOAD - Economic Alternatives to the Cross River Super Highway
Is it sensible for a broke Cross River State state to try to build a new "super highway" when its existing roads are in shambles and rural roads are insufficient? If this new road is economically viable why are there no investors? For facts - Download Economic Alternatives to the Cross River Super Highway HERE
This is an ambitious and expensive project. There has been so much debate about the human and environmental cost of the super highway and very little debate on its viability for investors. How will the project be funded and recouped? Why are there no investors?
Download Economic Alternatives to the Cross River Super Highway HERE
an in depth analysis from RRDC, Green Code and BudgIT
This is an ambitious and expensive project. There has been so much debate about the human and environmental cost of the super highway and very little debate on its viability for investors. How will the project be funded and recouped? Why are there no investors?
Download Economic Alternatives to the Cross River Super Highway HERE
an in depth analysis from RRDC, Green Code and BudgIT
Cross River Super highway victims cry for compensation
Over one year after losing crops to bulldozers for the ill fated Cross river superhighway farmers have been ignored. The "signature project" of Governor Ayayde has been fraught with procedural lapses, protests, lack of investors and an inability to secure Federal environmental permits despite for submissions for what is viewed by many as a logging scheme to access valuable hardwood.
Listen to the voices of those affected.
Sunday, 9 July 2017
FULL List of Conditions in FG Provisional EIA Approval of Cross River Super Highway
![]() |
There has been much rejoicing by the Cross River State Government over an "EIA approval" for its proposed superhighway. However what was obtained is a conditional approval with 23 pre-conditions. As usual people do not have the full text of the conditions and clearly the State Government is not releasing any details. Here is a list of all the pre-conditions many of which cannot be completed within a 2 week deadline or are vague at best.
23 CONDITIONS FOR PROVISIONAL
APPROVAL OF THE SUPERHIGHWAY PROJECT
Some Highlights
Plan to be revised and resubmitted within 2 weeks
- · Development and funding of biodiversity offset to be included
- · List of all affected 5 communities must be made public by the Cross River State Govt.
- - Communities already affected by earlier clearing before stop work order last year must be compensated before work commences
- · Create and implement resettlement plan etc before starting work
- · CRSG to maintain corridor at 70m. Reversal of revocation of earlier hotly contested
- 20.4km width with 10km either side offset must be GAZETTED before work commences. Affected land ownership revoked had included Bakassi, Akpabuyo, Calabar Municipality and Calabar South contrary to popular belief it was just a forest matter in Central and Northern LGs.
- · All non-Nigerian and Cross River wild life references to be addressed.
- · Long-term indirect impact on CRNP due to hunting and habitat loss to be addressed
- · All NGOs, national and international, to be consulted throughout
- · CRSG to protect hydrology and wildlife corridors
- · Map to be made clearer, should not cut through Ekuri or CRNP
- · Erosion controls to be included
- · Safety standards
Approval for the project subject to the following conditions:
- The EIA
approval shall cover only the construction of a 275km long by 70m width
Super Highway of 6 lanes including setbacks and other associated
infrastructures such as eco-friendly bridges, culverts, drainages from
Calabar to Katsina-Ala junction in Cross River State.
- Cross
River State Government (CRSG) shall ensure that the construction of the
entire road project and associated infrastructures conform to standard
engineering codes and International best practices.
- CRSG
shall ensure that the diverse management plans, which include
Environmental Management Plan (EMP); Biodiversity Action Plan (BAP);
Resettlement Action Plan (RAP); Livelihood Restoration Plan (LRP);
Greenhouse Gas Management Plan (GHGMP); Public Consultation Plan (PCP);
Waste Management Plan (WMP); Traffic Management Plan (TMP) as well as
Labour and Human Resources Plan (LHRP) put in place for the road project
are strictly adhered to as required throughout the project lifecycle.
- CRSG
shall engage a group of accredited Consultants to effectively manage the
diverse management plans for the proposed road project.
- CRSG
shall ensure the realignment of the 275.344km road corridor from the
boundary of the Cross River National Park is in line with the National
Park Service (NPS) Act CAP LFN 2016.
- CRSG shall ensure the re-routed road corridor is clearly
depicted on a map in the updated EIA report taking cognizance of the
boundary of Cross River National Park and Ekuri Community Forest as well
as conform to international best practices on setbacks for highways in
critical ecosystems such as the proposed corridor.
- CRSG
shall gazette the reversal of revocation order on the acquisition of 10km
on either side to the 70km span of the road corridor as well as the
gazetting of the boundary of Cross River National Park within two weeks
(2) of receipt of this letter.
- CRSG
shall ensure that the initial land clearing of the road corridor that was
carried out without due inventory of the third party properties/farmlands
is revisited to adequately compensate the project affected persons (PAPS)
in line with National and International standards of practice on
resettlement and restoration plans. This shall be done prior to project
commencement.
- CRSG
shall identify all proximate communities to the road corridor within the
established area of influence as well as the project affected persons (PAPS)
and ensure that every community/PAP is regularly consulted with throughout
the project lifespan.
- The
environmental offsetting should be one of the guiding principles for the
proposed road construction as the proposed project area of influence is
noted for endemic, threatened and endangered flora and fauna. There shall
be development and funding of Biodiversity offset by CRSG.
- CRSG
shall ensure that all relevant non-governmental organizations both local
and international are consulted with regularly during the project lifespan
to ensure among others biodiversity protection and project sustainability.
- CSRG
shall ensure that the highly technical eco-friendly bridges to be
constructed at strategic points/biodiversity hotspots/critical ecosystem
on the road corridor are intensively monitored by specialized accredited
consultants.
- CSRG
shall ensure that the borrow pits proposed for the road project are
provided with coordinates for ease of location, site identification
number, reclaimed and converted to alternative environmental-friendly uses
in line with regulatory standards as well as International best practices.
- CRSG
shall ensure that the proposed road setbacks from third party structures,
farmlands, critical ecosystem and green areas confirm to Engineering code
of practice/regulatory standards as well as International best practices.
- CRSG
shall ensure that cautionary signs are appropriately placed at strategic
points along the road corridor during implementation and throughout the
lifecycle especially for wildlife crossing.
- CSRG
shall ensure proper drainage termination for the flow route of
run-off/storm water to protect the road corridor from erosion, ensure that
the road embankment is constructed in a way that allows free-flow of
surface water run-off, that any existing access road to neighbouring
villages and settlements are not blocked, create appropriate buffer zones
to prevent damage to unique ecosystems as well as enhance forest cover
- CSRG
shall put in place appropriate road furniture and safety standards in line
with International best practices.
- CRSG
shall ensure that the proposed project protect the hydrology of wetlands,
streams and channels through restoration of natural drainage pattern and
reduce disruption of of ecological processes by providing wildlife
corridor.
- CSRG
shall provide adequate personal protective equipment for workers, ensure
that every worker on the project is adequately trained on Health; Safety
and Environment procedures for Highway and provide sanitary facilities and
mobile clinic during project construction
- CSRG
shall ensure that the maintenance and management of the road corridor is
in line with International best practices.
- There
shall be Impact Mitigation Monitoring (IMM), Post Impact Assessment (PIA),
Environmental Audits and Compliance Monitoring on the project by the
Federal Ministry of Environment in collaboration with other relevant
regulatory agencies.
- CSRG
shall put in place a robust contingency plan for the proposed road
project.
- CSRG
shall update 4th version of the EIA report to also include
the following:-
a. To exclude flora and fauna
that are non-existent in the proposed project area of influence as per the
attached;
b. A comprehensive list of
the actual affected communities along the proposed road corridor;
c. List of borrow pits with
coordinates and site identity for the proposed road project;
d. Map clearly showing the
preferred road corridor with coordinates as well as major crossings along the
entire stretch;
e. The EIA report should
consider indirect long term impacts of hunting and habitat loss on Cross River
National Park proximity to the Super Highway with improved access to the
forest.
f. The updated 4th version
of the EIA report shall be submitted to the Ministry within two (2) weeks of
the receipt of the letter.
ADD ON. In my opinion none of these requirements can be done in 2 weeks, there are still no funders and with the recent NDDC take over of the old Calabar - Oban - Ikom - Etung road the journey to Ikom will be 1hr without the super highway within the next 2 years well before the super highway 2022 proposed completion date.
Superhighway: Government seeks explanation on ‘strange’ wildlife EIA mentions - Environews
![]() |
| The roloway monkey is not found in Nigeria. Cross River State EIA claims it is. Photo credit: Sébastien Meys, La Palmyre Zoo |
This article appears in Environews
In a move that appear to call the authenticity of the report to question, the Federal Ministry of Environment (FMEv) has categorically stated that such wildlife do not exist in Cross River State – some not even in Nigeria – and therefore wants state officials to address such queries in the updated report that is expected to be submitted in two weeks.
For instance government explained that the Bunbundi bat (Chalinolobus egeria) has not been recorded from Cross River and the pitch shrew (Crocidura picea) has only ever been recorded from Cameroon.
Additionally, noted the FMEv, while the long footed shrew (Crocidura crenata) has not been recorded from Nigeria, the Eisentraut’s mouse shrew (Myosorex eisentrauti) is only found on the island of Bioko.
Similarly, the forest chameleon (Chamaeleo camurunensis) – assumed to be Trioseros camerunensis is restricted to Cameroon, while the Cameroon worm lizard (Cynisca shaeferi) has not been recorded from Nigeria.
Furthermore, both the Schneider’s banana frog (Afrixalus Schneider) and the Dizangue reed frog (Hyperrolius bopeleti) have only ever been recorded from Cameroon.
Also mentioned were the Werner’s river frog (Phrynobatrachus werneri) which FMEv officials say has only been recorded in Nigeria from the Obudu Plateau, and the worm lizard (Cynisca gansi), which is said to have only ever been recorded from Okoloma village near PortHarcourt.
The FMEv wrote: “Many of the species listed in Table 6.1 such as the Indian Malimba, Sclater’s guenon and the Anambra waxbill are not present in Cross River State, though known from Nigeria.
“Appendix A2 is clearly not the work of PGM Nigeria Limited and has merely been copied from elsewhere. This is unacceptable. The list contains many species not known from Cross River such as the Niger Delta red colobus monkey (Procolobus epieni); others such as the roloway monkey (Cercopithecus roloway) are not found in Nigeria and some are not even known from Africa such as the American bullfrog (Lithobates catesbaeianus).
“There is no hedgehog (Erinaceus or Atelerix) (listed on Table 4.56) found in the rainforests of Cross River State; it likely confused with the brush-tailed porcupine.
“Table 4.60 lists threatened mammal species, but Cercopithecus erythrogaster is not found in Cross River and Cercopithecus roloway is not found in Nigeria.”
Designed to link Calabar, the state capital, to the neighboring Benue State, the $3.5 billion Superhighway will pass through biodiversity rich forests in the Ekuri community as well as the Cross River National Park (CRNP), a development observers feel will have far reaching implications for thousands of families and their livelihoods, as well as flora and fauna.